07 · Special Contexts

Questions to Ask Home Builder

For buyers about to sign a build contract, whether on a production home in a subdivision or a custom build on your own lot. These questions cover what the base price includes, how allowances and change orders work, the draw schedule, site supervision, inspections, and the warranty you are actually getting.

20 questions · each with a note on why · conversation guide

The questions

Open any question for the note

  1. What is included in the base price, and where does the price stop?

    Why ask it

    The model home is built with upgrades, so the base price often excludes flooring beyond one grade, cabinet height, lighting, blinds, gutters, screens and final grading. Ask for the exclusions in writing, because that list is where the difference between your quote and your closing statement comes from.

  2. Can I see the full specification sheet, with brand and model for every item?

    Why ask it

    A spec sheet naming manufacturer and model is the only version you can compare or hold anyone to. Phrases such as builder grade cabinets or high efficiency furnace let a substitution happen later without anyone technically breaking the contract.

  3. How are the allowances set, and what happens when a selection comes in over?

    Why ask it

    Low allowances make a base price look competitive and then reappear as overages at selections, and tile, lighting and countertops are the usual offenders. Ask what a recent buyer actually spent against each allowance rather than what the allowance is.

  4. Is this a fixed price, cost plus, or fixed price with an escalation clause?

    Why ask it

    Cost plus means you carry material and labor swings, fixed price means the builder does, and an escalation clause quietly moves that risk back to you. If there is an escalation clause, ask what triggers it, whether it is capped, and what documentation you get to see.

  5. What is the draw schedule, and what has to be complete before each payment?

    Why ask it

    Payments tied to completed stages protect you; payments tied to dates do not. Watch for a schedule that runs ahead of the work, since money paid for framing before framing exists is money you cannot get back if the job stalls.

  6. What is the timeline from permit to closing, and how long did your last five homes actually take?

    Why ask it

    Every builder has a target schedule, and the useful number is the record against it. A builder who can quote the last five without checking is running a tracked operation, and a large gap between quoted and actual is the schedule you should plan around.

  7. What happens if the house is late: what excuses delay, and do I have any remedy?

    Why ask it

    Contracts typically excuse weather, supply and permitting, which covers nearly everything, and many carry no penalty at all. The practical question is what happens to your rate lock and your lease, so ask whether they will contribute to rent or an extension fee if the delay is theirs.

  8. Who is my point of contact once construction starts, and how often will I hear from them?

    Why ask it

    A sales agent hands you off after contract, and buyers who never learn who replaced them spend the build chasing information. Ask for a name, a weekly or biweekly update commitment, and who answers when that person is on vacation.

  9. How many houses will my site superintendent be running at the same time as mine?

    Why ask it

    Supervision is the single largest driver of finish quality, and a superintendent covering fifteen homes across two subdivisions is signing off on work they have barely seen. The answer also tells you how quickly a problem you flag will be caught.

  10. Which trades are your own employees, and which are subcontracted?

    Why ask it

    Most builders subcontract nearly everything, which is normal, so the real question is how long they have used those crews. A framing or plumbing crew that has worked with them for years is a better predictor of quality than any brochure.

  11. What is the change order process, what does it cost, and when does each decision close?

    Why ask it

    Change orders usually carry an administrative fee on top of the work and get expensive once a stage is framed or poured. Ask for the deadline by trade, because the same change costs nothing before rough in and thousands after drywall.

  12. When are selections locked, and can I have the decision calendar now?

    Why ask it

    Selection deadlines arrive faster than buyers expect and missing one means the builder picks for you, defensibly. Getting the calendar up front lets you book design appointments and price options before you are deciding under pressure.

  13. Can I walk the site during construction, and under what conditions?

    Why ask it

    Liability rules vary, and a flat refusal is worth pushing on, since the pre drywall walk is the last chance to see wiring, plumbing and framing. A builder who schedules escorted visits at framing and pre drywall is confident about what is behind the walls.

  14. Can I hire my own inspector at framing, pre-drywall and final?

    Why ask it

    Municipal inspections check code compliance, not workmanship, and a private inspection at pre drywall routinely finds items nobody else was looking for. Resistance to an independent inspector is one of the clearest signals in the whole conversation.

  15. What is the exact scope on the lot: grading, drainage, driveway, utility connections and landscaping?

    Why ask it

    Site work is where custom and semi custom budgets break, particularly on rock, fill, long utility runs or a septic system. Ask what is assumed rather than surveyed, because an assumption becomes a change order once the excavator hits something.

  16. How is the house's energy performance verified, and will there be a blower door and duct test?

    Why ask it

    Tested numbers say more than a list of efficient equipment, and a house can hold good windows and a good furnace while leaking through the envelope. Ask for the report on a recently completed home rather than a description of their standards.

  17. What warranty comes with the house, who backs it, and how do I make a claim?

    Why ask it

    The common structure is one year on workmanship, two on systems and ten on structure, but the backing matters more than the terms: a builder's own promise ends when the builder does, while a third party insured warranty does not. Ask for the actual warranty booklet, not a summary.

  18. How do you handle the punch list at walkthrough, and is there a follow-up visit before the warranty year ends?

    Why ask it

    You want a written list, a completion deadline, and confirmation that closing does not waive open items. A builder who schedules an eleven month visit before the workmanship year expires is planning to fix drywall cracks and settling rather than wait you out.

  19. What happens if I cancel, or if my financing falls through, and what is non-refundable?

    Why ask it

    Deposits, design fees and completed custom work are commonly kept, and on a custom build the exposure can be far larger than the deposit. Get the numbers and the trigger points before you sign, not when something changes.

  20. What decision do your buyers most often wish they had made differently?

    Why ask it

    A builder with real history answers immediately, usually about spending on finishes instead of structure, layout or site work. An answer of nothing means either a short track record or a sales conversation rather than a build conversation.

Before You Sign a Build Contract

Practical guidance for the conversation itself

Get It on Paper

Ask for the exclusions list, not just the inclusions

Every builder can produce a features sheet. Far fewer will hand over a written list of what is not in the price. Request it directly, then price the missing items: window coverings, gutters, screens, garage door opener, landscaping, appliances, final grading. That total is the gap between your contract and your move in cost.

Have someone independent read the contract

A real estate attorney reading a builder contract for an hour or two is the cheapest part of the project. The clauses worth their time are escalation, delay and excused delay, arbitration and venue, warranty disclaimers, and what happens to your deposit if either side walks.

Tie payments to completed stages

Draws should follow work, verified by an inspection or a lender disbursement. If the schedule is date based, ask to change it. On a custom build, ask about lien waivers from subcontractors at each draw, since an unpaid trade can lien your house even after you have paid the builder.

Check the Builder, Not the Model Home

  • Verify the license and insurance in your state, and confirm the entity name on the contract matches the licensed entity.
  • Ask for addresses of three homes finished twelve to twenty four months ago, then contact those owners. Problems surface in the second year, not at closing.
  • Ask a reference two specific questions: how the builder handled something that went wrong, and how long warranty items took.
  • Search your state contractor board and local court records for complaints or liens against the entity and its principals.
  • Walk an active site unannounced on a weekday. Site cleanliness, material stored out of the weather and crews present tell you how the work is run.
  • Ask who holds your deposit and whether it sits in escrow or in the builder's operating account.

During the Build

Book the pre-drywall walk yourself

Once drywall goes up, framing, wiring, plumbing and insulation are unavailable to inspect for the life of the house. Photograph every wall before it closes, with a tape measure in frame where fixtures will go. Those photos are useful for years, from hanging a television to finding a pipe.

Keep one written thread per issue

Email, one subject per issue, dated, with photographs. Site conversations get forgotten and superintendents change mid project. When an item reaches warranty months later, the thread is what establishes that it was raised during construction.

Do not close with open items undocumented

Walk the house with the punch list in hand and confirm in writing that closing does not waive incomplete work. Where something significant is unfinished, ask about holding funds in escrow until it is done rather than accepting a verbal promise on closing day.