Skip to content
Question Vault?
Free to readNo accountNo email wallNo invented statisticsNo ads on medical, legal or end-of-life pagesCopy or print any set and take it with you
04 · Practical & Life Logistics

Questions to Ask When Buying a Spec Home

For buyers looking at a finished or nearly finished house that a builder put up without a buyer under contract, so the build details sit in the builder's files rather than in the listing. These 20 questions cover how long it has sat unsold, what the price includes, the lot and its drainage, inspections and permit records, incentives, warranty coverage and the contract terms.

20 questions · each with a note on why · conversation guide

The questions

Open any question for the note

  1. When was this home completed, and how long has it been sitting unsold?

    Why ask it

    A builder paying interest on a finished spec every month is far more negotiable than one selling a house that just received its certificate of occupancy. The answer also tells you how long systems sat idle, which matters for the HVAC, the water heater, and dried out plumbing traps.

  2. Was this always a spec, or did a previous buyer's contract fall through?

    Why ask it

    A canceled contract often means the earlier buyer's inspector found something or their appraisal came in low. Ask directly why the deal died, then ask to see that buyer's inspection report and the builder's written response.

  3. Has this home ever been used as a model, a sales office, or a rental?

    Why ask it

    A model absorbs months of foot traffic on the floors and stairs, a converted sales office has had walls, wiring, and flooring altered and then put back, and a house rented out while it waited has been lived in by someone with no stake in it. Any of the three should be disclosed and priced below an untouched spec, so ask what was removed or reinstated and get the answer in writing.

  4. What exactly is included at this price, and what is not?

    Why ask it

    Spec listings routinely leave out the refrigerator, window blinds, fencing, gutters, rear landscaping, irrigation, and garage door openers. A written inclusions list keeps you from spending several thousand dollars in your first week.

  5. Are any selections still open, and when is the cutoff?

    Why ask it

    If the house is not fully finished you may still control paint, flooring, counters, or fixtures. Knowing the exact cutoff date prevents you from asking for a change after the trade has already been scheduled.

  6. How does this lot compare with the others in the community, and how was it priced?

    Why ask it

    Builders tend to put specs on the lots nobody chose: the one backing the collector road, the drainage easement, or the retention pond. Ask what lot premium a custom buyer would have paid here versus the best lots in the same phase.

  7. What incentives are on the table, and what conditions come attached?

    Why ask it

    Builder incentives are usually tied to their preferred lender, their title company, or a fixed closing date, because cutting the sale price would damage the comps for the rest of the subdivision. Get one competing loan estimate and compare total cost before you accept.

  8. What is left to build here, and how long will construction continue around me?

    Why ask it

    Buying a spec in an early phase can mean years of dust, nails in the street, and trade trucks on your curb. Ask for the remaining lot count, the projected buildout date, and the haul route the crews use.

  9. What is planned for the vacant land beside and behind this lot?

    Why ask it

    The tree line behind the house is not yours unless it is on your deed. Find out who owns that land, how it is zoned, and whether the builder holds an option on a future phase there.

  10. Can I see the permit file, every passed inspection, and the certificate of occupancy?

    Why ask it

    Signed inspections at footing, framing, rough-in, and final are the paper trail proving the city watched this house get built. Gaps in the record, a failed inspection with no re-inspection, or a missing certificate of occupancy are all reasons to slow down.

  11. May I hire my own inspector, and how many visits do I get before closing?

    Why ask it

    Some builder contracts quietly limit third-party inspections. You want written permission for a full inspection plus a re-inspection after repairs, because the municipal inspector checks code minimums, not workmanship.

  12. Since the drywall is already closed up, what records exist from the pre-drywall stage?

    Why ask it

    Framing photos, moisture readings, and rough-in documentation are the only way to see what is now hidden behind finished walls. If the lumber stood open through a wet season and nobody took moisture readings before insulating, that is worth knowing before you buy.

  13. Who was the site superintendent on this house, and is that person still with the company?

    Why ask it

    One superintendent's judgment shapes quality more than the brand name on the entrance sign, and continuity matters when you file a warranty claim in month three. Ask which crews handled framing, roofing, and plumbing while you are at it.

  14. Which warranty periods apply, and who actually backs the structural coverage?

    Why ask it

    Most builders offer roughly one year on workmanship, two on systems, and ten on structure, but the value depends entirely on whether an insurance carrier stands behind it or the builder self-insures. A small builder self-insuring a ten year structural promise is only as good as the company's survival.

  15. How do warranty claims work once I have closed?

    Why ask it

    You want the submission method, the response window in writing, whether the original trade or a general handyman performs the repair, and what qualifies as an after-hours emergency. Vague answers here reliably predict vague service later.

  16. What is your walkthrough and punch list process, and how long can I keep adding items?

    Why ask it

    Cosmetic defects such as drywall cracks, nail pops, and sticking doors appear over the first several months as the house settles and dries. Many builders schedule a thirty day and an eleven month visit, and you want that commitment in writing before closing.

  17. How was this lot graded and drained, and where does water go in a heavy rain?

    Why ask it

    Grading, swales, downspout extensions, and sump discharge cause more expensive spec home problems than anything else, and they are the easiest step to rush on a fast build. Walk the lot during or right after a storm and photograph what you find.

  18. Can I see the mechanical and energy documentation for this specific house?

    Why ask it

    Ask for the HVAC load calculation, the duct design, the blower door and duct leakage results, and the energy rating if one was done. A system sized by rule of thumb rather than calculation will cost you comfort and utility money for twenty years.

  19. What will my tax bill and any special district assessments look like in year two?

    Why ask it

    New construction is often assessed on land value alone for the first cycle, then jumps sharply once the finished house hits the tax roll. Also ask whether this lot carries community development district, municipal utility district, or improvement district bond payments stacked on top of HOA dues.

  20. What does the contract say about arbitration, appraisal shortfalls, and implied warranties?

    Why ask it

    Builder contracts are drafted by the builder's lawyers and commonly push disputes into binding arbitration, substitute the limited written warranty for the implied warranty of habitability, and let the builder keep your deposit if financing shifts. Have a real estate attorney read it, since these terms are sometimes negotiable and always consequential.

How to Evaluate a Spec Home

Practical guidance for the conversation itself

What to Do Before You Sign

Bring Your Own Inspector, Twice

Hire an independent inspector even though the house passed municipal inspection, and budget for a second visit after repairs. Code inspectors check minimums on a short walkthrough. Your inspector should get on the roof, into the attic to check duct connections and insulation depth, and run a moisture meter around windows, showers, and exterior walls.

Price the Incentive Against an Outside Lender

Builders protect the sale price because it sets the comps for every remaining lot, so they pay closing costs or buy down your rate instead, usually on the condition that you use their lender. Pull one competing loan estimate and compare total cost over the years you plan to stay rather than the monthly payment alone.

Have an Attorney Read the Contract, Not the Sales Agent

The on-site agent works for the builder. A real estate attorney should flag the arbitration clause, the warranty disclaimer, the appraisal and financing contingencies, and any clause letting the builder substitute materials of equal or better quality without notifying you.

Walk the Lot in the Rain

Drainage is the defect that costs the most and surfaces the latest. Look for ground sloping away from the foundation on all sides, downspouts discharging well past the backfill, and no low spot holding water near the house. Take dated photos so you have a record if the grade changes after closing.

Red Flags on a Spec Home

  • The builder will not say why a previous contract on the house fell through.
  • You are told a third-party inspection is unnecessary because the city already inspected it.
  • No pre-drywall photos or moisture records exist for a house framed through a wet season.
  • The ten year structural warranty is backed by the builder itself rather than an insurance carrier.
  • The inclusions list is verbal, and the finishes in the model do not match the finishes in this house.
  • Sod, irrigation, or final grading were done months after the rest of the work, which often signals a repair.
  • The lot backs a retention pond, utility easement, or planned collector road that the sales materials never mention.
  • The incentive expires in seventy two hours and requires waiving your appraisal contingency.

Paperwork to Collect Before Closing

  • Certificate of occupancy plus the complete permit and inspection history.
  • Written inclusions and specifications list with appliance and fixture model numbers.
  • Limited warranty document naming the carrier, the coverage periods, and the claim process.
  • Manufacturer warranties with model and serial numbers for HVAC, water heater, roof, and windows so you can register them in your name.
  • Survey, recorded plat, and final grade certification for the lot.
  • HOA governing documents, current budget, reserve study, and any special assessment district disclosure.
  • Signed punch list from the pre-closing walkthrough with target completion dates.
  • Any prior buyer's inspection report and the builder's documented response to it.